EPD Expiry Watch

Patcraft: 10 carpet tile EPDs expire February 2027

Walker Ryan
Walker RyanChief Executive Officer
July 14, 20265 min read

Eight months from now, ten Patcraft carpet tile EPDs reach their end dates in February 2027. Several have newer declarations available, but others do not. If replacements lag, specifiers on EPD‑required projects will pivot to competitors with current declarations, and that can quietly drain pipeline. Here is what is expiring, where coverage exists, and where a short‑term gap could form. For live listings, Patcraft’s sustainability pages are the best first stop (Patcraft, 2026).

Logo of patcraft.com

What is expiring in February 2027

Below are the ten Patcraft declarations with February 2027 end dates. All are modular carpet tile families unless noted.

  • EcoWorx BIO Carpet Tile with EcoSolution Q100 face fiber
  • EcoWorx Platinum Carpet Tile with EcoSolution Q, Solution Q, or Solution Q Extreme face fiber
  • EcoWorx Carpet Tile with EcoSolution Q, Solution Q, or Solution Q Extreme face fiber
  • StrataWorx Carpet Tile with EcoSolution Q, Solution Q, or Solution Q Extreme face fiber
  • EcoLogix Carpet Tile with EcoSolution Q face fiber
  • StrataWorx Carpet Tile with EcoSolution Q100 face fiber
  • EcoWorx Platinum Carpet Tile with EcoSolution Q100 face fiber
  • EcoLogix Carpet Tile with EcoSolution Q100 face fiber
  • EcoWorx Carpet Tile with EcoSolution Q100 face fiber
  • EcoWorx Carpet Tile Walk‑Off Mat with polyester face fiber

Dates refer to EPD validity windows, not product availability. As of June 20, 2026, these sit within MasterFormat 09 68 00 and support spec eligibility wherever a current, product‑specific EPD is requested.

Replacements already in place

Good news first. Patcraft’s mainstream EcoWorx carpet tile lines are already covered by newer declarations. Two paths show up for specifiers today.

  • EcoWorx Carpet Tile has newer UL‑listed declarations published in 2023 that run beyond 2027, so coverage continues on standard EcoWorx tile.
  • EcoWorx M Carpet Tile carries 2025 issue dates with validity through 2030, providing a longer runway for many Patcraft modular styles.

In other words, where projects call for typical EcoWorx modular tile, current EPDs exist and the 2027 expiries are unlikely to disrupt bids.

Join Parq Pulse!

Stay ahead of product and environmental data shifts to win more projects.

Likely gaps without action

Other niche or premium constructions do not yet show newer EPDs as of June 20, 2026.

  • EcoWorx BIO Carpet Tile
  • EcoWorx Platinum Carpet Tile
  • StrataWorx Carpet Tile
  • EcoLogix Carpet Tile
  • EcoWorx Walk‑Off Mat

If these are the exact constructions required in a spec, teams could momentarily lose EPD documentation once February 2027 passes. That creates friction on EPD‑required work, especally public or institutional projects where submittals are tight.

Where specifiers may pivot if a gap appears

Competitors with current carpet tile EPDs are easy to find and will fill the slot if a Patcraft family sits without an active declaration.

  • Interface CQuest series modular carpet tiles remain covered by current declarations across multiple backings and yarn weights.
  • Mohawk Group EcoFlex modular platforms publish product‑specific EPDs on several cushion and hardback variants.
  • Tarkett ethos Modular and Flex‑Aire Modular Cushion carry current EPDs and show up often on large interiors projects.

We are not ranking performance or design here. The point is commercial: on EPD‑required jobs, current documentation is a tiebreaker that keeps a product in the conversation.

What this means for sales and project teams

EPDs are typically issued on a multi‑year cycle, so renewal timing matters most in the final year. Sales teams rarely see the specs they miss due to lapsed documentation, which is why a simple dashboard of “expires by quarter” prevents last‑minute scrambles. For Patcraft lines with coverage already extended, keep selling. For the five families without visible replacements, confirm owner and A&D preferences early and line up alternates.

Renewal playbook to stay spec‑ready

A quick, low‑drama renewal sequence for February 2027 expiries looks like this.

  1. Confirm the target PCR and program operator now, then lock the reference year data pull.
  2. Centralize utility, material, and waste data by site. Ask for the minimum viable set first, then iterate.
  3. Align the publication window with key bid dates so the renewed EPD is live before submittals.

This keeps teams focused on selling while the heavy LCA data wrangling happens behind the scenes.

Where to check for updates

Patcraft aggregates sustainability documents and product certifications on its site, including EPDs and Declare labels. Bookmark the sustainability hub and check product‑level pages for the latest documentation updates (Patcraft, 2026). For Patcraft’s resilient EPDs published in the International EPD System, searching the operator’s library is also useful in a pinch (EPD International, 2024).

Bottom line for February 2027

Standard EcoWorx carpet tiles appear covered by newer declarations, so disruption risk is low there. For EcoWorx BIO, EcoWorx Platinum, StrataWorx, EcoLogix, and Walk‑Off Mat, we do not yet see a public replacement as of June 20, 2026. If those are in your pipeline, treat Q3–Q4 2026 as the renewal window and reccomend a backup option with a current EPD so bids keep moving.

Patcraft sustainability hub (Patcraft, 2026)
Patcraft environmental impact overview (Patcraft, 2026)

Sign up for our weekly newsletter

Get the latest on ESPR, EPDs, and sustainability regulations delivered to your inbox every week.

Frequently Asked Questions

Which Patcraft EPDs are set to expire in February 2027?

Ten modular carpet declarations: EcoWorx BIO, EcoWorx Platinum, EcoWorx with EcoSolution Q family, StrataWorx, EcoLogix, and the EcoWorx Walk‑Off Mat. Several cover Q100 face fiber variants.

Are there replacement Patcraft EPDs already published?

Yes for core EcoWorx carpet tile, including newer 2023 UL EPDs and the 2025 EcoWorx M series. We did not find newer public EPDs for EcoWorx BIO, EcoWorx Platinum, StrataWorx, EcoLogix, or Walk‑Off Mat as of June 20, 2026.

Which competitor products have current EPDs in the same category?

Interface CQuest modular tiles, Mohawk Group EcoFlex modular platforms, and Tarkett ethos Modular or Flex‑Aire Cushion all have current carpet tile EPDs and are common alternates.

Will specifiers lose access to Patcraft EPD data for these products?

Only for families without a replacement after February 2027. For standard EcoWorx tiles, newer EPDs already maintain continuity. For BIO, Platinum, StrataWorx, EcoLogix, and Walk‑Off Mat, a short‑term gap is possible if renewals are not published in time.

Where can I monitor Patcraft’s latest EPD postings?

Use Patcraft’s sustainability pages and product detail pages for live document links (Patcraft, 2026). For resilient lines published in the International EPD System, search the operator’s library ([EPD International, 2024](https://environdec.com/library/epd13922)).

Want to win more bids?

Parq helps construction materials manufacturers get spec'd more often with industry-leading EPDs and LCAs.

Get in Touch

About the Author

Photo of Walker Ryan

Walker Ryan

Chief Executive Officer at Parq

Walker Ryan is a climate-tech entrepreneur focused on driving industrial decarbonization through better data. As the founder and CEO of Parq, he helps manufacturers generate high-quality, third-party–verified carbon disclosures at scale—accelerating a traditionally slow and expensive process. Before starting Parq, Walker led over $200 million in sustainability-focused investments as VP of Strategy & Growth at ReStream Solutions, following earlier experience in investment banking at Deutsche Bank. He brings a rare mix of capital markets expertise and hands-on sustainability knowledge to tackling the infrastructure of industrial emissions.

More in EPD Expiry Watch