

What is expiring in February 2027
Below are the ten Patcraft declarations with February 2027 end dates. All are modular carpet tile families unless noted.
- EcoWorx BIO Carpet Tile with EcoSolution Q100 face fiber
- EcoWorx Platinum Carpet Tile with EcoSolution Q, Solution Q, or Solution Q Extreme face fiber
- EcoWorx Carpet Tile with EcoSolution Q, Solution Q, or Solution Q Extreme face fiber
- StrataWorx Carpet Tile with EcoSolution Q, Solution Q, or Solution Q Extreme face fiber
- EcoLogix Carpet Tile with EcoSolution Q face fiber
- StrataWorx Carpet Tile with EcoSolution Q100 face fiber
- EcoWorx Platinum Carpet Tile with EcoSolution Q100 face fiber
- EcoLogix Carpet Tile with EcoSolution Q100 face fiber
- EcoWorx Carpet Tile with EcoSolution Q100 face fiber
- EcoWorx Carpet Tile Walk‑Off Mat with polyester face fiber
Dates refer to EPD validity windows, not product availability. As of June 20, 2026, these sit within MasterFormat 09 68 00 and support spec eligibility wherever a current, product‑specific EPD is requested.
Replacements already in place
Good news first. Patcraft’s mainstream EcoWorx carpet tile lines are already covered by newer declarations. Two paths show up for specifiers today.
- EcoWorx Carpet Tile has newer UL‑listed declarations published in 2023 that run beyond 2027, so coverage continues on standard EcoWorx tile.
- EcoWorx M Carpet Tile carries 2025 issue dates with validity through 2030, providing a longer runway for many Patcraft modular styles.
In other words, where projects call for typical EcoWorx modular tile, current EPDs exist and the 2027 expiries are unlikely to disrupt bids.
Join Parq Pulse!
Stay ahead of product and environmental data shifts to win more projects.
Likely gaps without action
Other niche or premium constructions do not yet show newer EPDs as of June 20, 2026.
- EcoWorx BIO Carpet Tile
- EcoWorx Platinum Carpet Tile
- StrataWorx Carpet Tile
- EcoLogix Carpet Tile
- EcoWorx Walk‑Off Mat
If these are the exact constructions required in a spec, teams could momentarily lose EPD documentation once February 2027 passes. That creates friction on EPD‑required work, especally public or institutional projects where submittals are tight.
Where specifiers may pivot if a gap appears
Competitors with current carpet tile EPDs are easy to find and will fill the slot if a Patcraft family sits without an active declaration.
- Interface CQuest series modular carpet tiles remain covered by current declarations across multiple backings and yarn weights.
- Mohawk Group EcoFlex modular platforms publish product‑specific EPDs on several cushion and hardback variants.
- Tarkett ethos Modular and Flex‑Aire Modular Cushion carry current EPDs and show up often on large interiors projects.
We are not ranking performance or design here. The point is commercial: on EPD‑required jobs, current documentation is a tiebreaker that keeps a product in the conversation.
What this means for sales and project teams
EPDs are typically issued on a multi‑year cycle, so renewal timing matters most in the final year. Sales teams rarely see the specs they miss due to lapsed documentation, which is why a simple dashboard of “expires by quarter” prevents last‑minute scrambles. For Patcraft lines with coverage already extended, keep selling. For the five families without visible replacements, confirm owner and A&D preferences early and line up alternates.
Renewal playbook to stay spec‑ready
A quick, low‑drama renewal sequence for February 2027 expiries looks like this.
- Confirm the target PCR and program operator now, then lock the reference year data pull.
- Centralize utility, material, and waste data by site. Ask for the minimum viable set first, then iterate.
- Align the publication window with key bid dates so the renewed EPD is live before submittals.
This keeps teams focused on selling while the heavy LCA data wrangling happens behind the scenes.
Where to check for updates
Patcraft aggregates sustainability documents and product certifications on its site, including EPDs and Declare labels. Bookmark the sustainability hub and check product‑level pages for the latest documentation updates (Patcraft, 2026). For Patcraft’s resilient EPDs published in the International EPD System, searching the operator’s library is also useful in a pinch (EPD International, 2024).
Bottom line for February 2027
Standard EcoWorx carpet tiles appear covered by newer declarations, so disruption risk is low there. For EcoWorx BIO, EcoWorx Platinum, StrataWorx, EcoLogix, and Walk‑Off Mat, we do not yet see a public replacement as of June 20, 2026. If those are in your pipeline, treat Q3–Q4 2026 as the renewal window and reccomend a backup option with a current EPD so bids keep moving.
Patcraft sustainability hub (Patcraft, 2026)
Patcraft environmental impact overview (Patcraft, 2026)


