

What is expiring in January 2027
Jotun has a large portfolio in circulation today, and five of those EPDs are scheduled to end in January 2027. Two are publicly verifiable on operator sites:
- JOTUN Grunning og lim for våtrom, Jotun A/S. Valid through 2027‑01‑06. (EPD Norway, 2022)
- Hardtop Eco, Jotun Saudia Co. Ltd. (Yanbu). Valid through 2027‑01‑06. (EPD Norway, 2022)
EC3 also flags three additional Jotun declarations with January 2027 end dates. These appear to be region‑specific decorative or protective coatings issued the first week of January 2022. Their operator PDFs are not easily discoverable by public search today, so we are not naming them here to avoid confusion. If you need the precise SKUs, ask procurement or your EPD owner inside Jotun to share the NEPD numbers.
Are replacements already posted for the same products
For the wet‑room primer above, we do not see a newer product‑specific EPD live on EPD Norway as of May 21, 2026. That suggests a renewal task is still open on Jotun’s side. (EPD Norway, 2022)
For Hardtop Eco, there are current EPDs for the same product family from other Jotun plants that remain valid well beyond 2027. Examples include a U.A.E. listing with later validity and a Turkey listing to mid‑2027. (EPD Norway, 2023–2025) (EPD Norway, 2022)
That nuance matters. Many project teams want the same product, same facility scope, and the same verification date for clean documentation. A different plant EPD can help in some specs, but will not always be a straight swap.
Likely alternates with current EPDs if a gap forms
If the January window passes without new Jotun PDFs for the exact SKUs above, teams will likely reach for functionally similar coatings with active declarations.
Interior and facade paints
- PPG Sigma Siloxan All Season and Sigma Indurin Matt. Valid to 2031‑04‑21 under the International EPD System. (PPG, 2026)
- Jotun’s own decorative portfolio has many live entries, yet if a product‑specific gap persists you will see specifiers short‑list other A2‑compliant paints carrying current EPDs like Exence Paint, valid to 2030‑02‑27. (IES, 2025)
Protective topcoats and high‑build finishes
- CapaThane PU Top Coat, two‑component polyurethane topcoat. Valid to 2027‑12‑11. (IES, 2022)
- ISOMAT EPOXYCOAT‑W, water‑based epoxy coating for floors and walls. Valid to 2028‑05‑28. (IES, 2023)
Powder coatings for building components
- AkzoNobel Interpon D3000 hyper‑durable powder coatings. Valid to 2028‑05‑23. (IES, 2024)
These are not one‑to‑one substitutions in every specification, but they do keep carbon accounting and LEED v5 documentation on track when a product‑specific EPD is required.
Will specifiers lose access to EPD data
Short answer, not if replacements land before submissions. The risk window is real though. Once an EPD passes validity, many owners and GCs treat it as non‑usable for credit documentation. There are edge cases where a recently expired document rides through, but that is a gamble very few teams want to take.
Renewal timing and why it pays to move early
Jotun publicly highlights that it maintains hundreds of product‑specific EPDs globally, and its portfolio grows each year. Still, renewals stack up fast when several 2022 issues come due together. A tight renewal sequence protects revenue by removing avoidable friction in pre‑con and procurement. It also avoids last‑mile value‑engineering away from your SKUs simply because a PDF fell out of date on the wrong week. This is one of those quiet, unflashy tasks that definately pays for itself.
What to do now
- Calendar the January 2027 date for affected SKUs and align plant scope with project needs. If a facility‑specific declaration is required, plan capacity for new primary data collection.
- If a gap looks likely, line up drop‑in alternates with current EPDs and pre‑agree acceptance with the design team.
- Confirm which PCR version the renewal must use so your new results remain comparable in bids.
Where to find Jotun’s current EPDs
- Operator listings for select Jotun products are visible on EPD Norway. A useful starting point: JOTUN Grunning og lim for våtrom and Hardtop Eco, both dated in early 2022. (EPD Norway, 2022) (EPD Norway, 2022)
- Jotun’s own EPD overview is here and regularly refreshed. It is handy for quick confirmation and pointers to operator pages. (Jotun, 2026)
- Third‑party directories sometimes surface specific SKUs by family, for example Majestic Beauty & Resist on EPD Directory. (EPD Directory, 2026)
Related deep dives
If you track expiring declarations across coatings, this recent note is helpful context on timing and alternates: EPD Expiry Watch: Jotun items due in December 2026.
The thread to watch
The next eight months are all about execution. January 2027 renewals for the five flagged items will keep bid packages clean and avoid last‑minute swaps. If your portfolio has several early‑2022 issues, pulling renewals forward now keeps sales teams focused on winning work, not hunting PDFs.


