

Four expiries, and a mismatch
DR Johnson Wood Innovations is a family-owned engineered wood producer in Riddle, Oregon. It makes glulam beams and cross-laminated timber (CLT), and it was the first certified CLT manufacturer in the United States. So you'd expect an EPD expiry alert for this company to be about timber panels. It isn't.
As of late November 2026, the manufacturer record carrying the DR Johnson name in the EC3 database holds 13 current declarations and one expired one. Six of them expire in 2027, and four of those share the same date: 1 July 2027. Every one of those four is a French Product Environmental Profile (PEP) for a residential heat pump. None of them covers a wood product.
Which EPDs expire in July 2027
All four were published through the PEP ecopassport program, the French scheme for electrical, electronic and HVAC equipment. All of them follow the program's rules for electrical, electronic and HVAC-R products. They come in two pairs:
- Pompe à chaleur air/air réversible, gamme Takai murale R32 (two records: one is coded MasterFormat 23 81 00, the other has no code and declares a 5 kW unit with a 17-year reference service life)
- Pompe à chaleur air/air réversible, gamme Mokai murale R32 (two records with the same split)
That makes two product ranges, each listed twice. Takai and Mokai are wall-mounted reversible air-to-air split units. They run on R32 refrigerant and are sold in France under the Hitachi brand. So the expiry really affects two product families, not four, and both belong to the residential HVAC market.
How heat pumps ended up on a timber record
The rest of the record follows the same pattern. It holds a York YVAM air-cooled chiller EPD, two Glynn-Johnson overhead door stop EPDs, and several Hitachi heat pump, VRF and water heater profiles. The common thread is the word "Johnson". It looks like declarations from the Johnson Controls family of brands (and one door-hardware brand) were matched to the wrong manufacturer, a bit like a mail carrier delivering every letter addressed to "Johnson" to the same house on the street.
Separate records named Hitachi and Johnson Controls already exist in the same database. They hold sibling declarations such as the Triple C R32 multi-split systems and the Airhome 400 wall units. For DR Johnson Wood Innovations, the practical result is a profile that shows plenty of EPD activity but no product-specific declarations for its actual glulam and CLT lines.
Join Parq Pulse!
Our weekly newsletter for manufacturers mobilizing product and environmental insights to remain competitive and win more projects.
Is a replacement already in place?
For Takai and Mokai as standalone wall units, we couldn't find a newer declaration, either on the DR Johnson record or on the Hitachi and Johnson Controls records. The closest thing is a PEP for Triple C R32 with Mokai indoor units, valid until 1 July 2029. But that's a multi-split thermodynamic system that also produces domestic hot water, which is a different functional unit from a mono-split wall unit.
With eight months to go, that leaves a real gap. Under France's RE2020 regulation, project teams use PEPs and FDES (the French construction product declarations) from the INIES database as product-specific data. When no valid declaration exists, they have to fall back on default environmental values, which are set deliberately conservative. Specifiers on carbon-capped projects pay attention to that penalty.
Competing wall units with current declarations
Several competitors already hold current declarations in the same niche. Mitsubishi Electric has a PEP for a residential mono-split inverter R32 wall unit, valid until June 2028. It also has a multi-split wall-mounted R32 system (MXZ-2F53VFHZ outdoor unit with MSZ-LN indoor units) that stays valid until January 2029. Both are close matches for anyone who would otherwise have specified Takai or Mokai.
Panasonic covers the same category with a 2.5 kW wall-mounted R32 unit (TZ25WKE), but that PEP expires on 31 October 2027, only a few months after the Hitachi ranges. Its BZ35XKE 3.5 kW wall unit expires in September 2027. So the competitive field isn't crowded with fresh declarations, and whoever renews first gets a clean run at specs that need product-specific data.
The timber gap nobody is watching
For mass timber specifiers in North America, the July expiries don't matter much, because no wood declarations were ever on this record. What does matter is that we found no current product-specific EPD for DR Johnson glulam or CLT under its name. That's a missed opportunity in a category where embodied carbon is often the reason a project picks wood in the first place.
Competitors have filled that space. Mercer Mass Timber holds three CLT declarations published through ASTM International under the Part B rules for structural and architectural wood products, all valid until March 2030. Kalesnikoff has CLT and glulam EPDs under the same PCR, though both expire in March 2027. A mass timber project that needs product-specific data for LEED v5 embodied carbon credits or a Buy Clean-style procurement policy will usually go with a supplier that has a verified EPD, rather than accept generic or industry-average values and the conservative assumptions that come with them.
Why attribution and timing both count
An EPD only earns its keep if specifiers can find it under the right name. If a declaration is filed under the wrong manufacturer, it's like a spec sheet stapled into someone else's binder. It's technically published but commercially invisible. It's worth checking database listings once a year, alongside expiry dates, because misattribution hurts both the brand that loses the listing and the brand that wrongly receives it.
Timing is the other lever. A renewal usually needs a fresh reference year of utility, production and waste data, a check on whether the original PCR has been revised, and third-party verification. Starting six to nine months before expiry is a sensible baseline. That makes November 2026 roughly the last comfortable moment for any manufacturer with a July 2027 deadline to begin.
What the July deadline really tells us
In practical terms, two Hitachi wall-mounted heat pump ranges are heading toward a data gap in the French market, with no like-for-like replacement visible yet. Mitsubishi Electric has current coverage in place. Meanwhile, a respected Oregon timber producer shows up in the database with no wood declarations of its own, next to CLT competitors that have them.
Both problems have the same fix: an accurate listing and a declaration that's current when the spec is written. Manufacturers who look after both rarely lose a project to paperwork.


