EPDs for Floor Boxes in Europe, data based guide
Planning a product specific EPD for floor equipment boxes in Europe in 2026 and want the full lay of the land fast. Here is the definitive, numbers first guide based on what specifiers actually see. We also cover synonyms you will meet in searches, like floor boxes, recessed floor outlet boxes, floor service boxes and poke thru devices.


What we measured and why it matters
Floor equipment boxes sit at the intersection of electrical distribution and interior fit out, so specifiers look for clean EPDs that map to EN 15804 and recognizable program operators. We tallied current, public EPDs in Europe for this product family, then reviewed who published them, which PCRs they used, and when renewals will hit.
Two quick market context points. New construction product EPDs in Europe are created to EN 15804 A2 since the A1 transition ended at IBU in Oct 2022 (IBU, 2025). Validity is typically five years from verification, with mid cycle updates if any declared indicator worsens more than 10 percent (EPD International FAQ, 2024).
The five year snapshot
In the last five years there are 18 current EPDs in Europe for floor equipment boxes, issued by 5 manufacturers across 3 program operators and 3 distinct PCRs.
EPDs issued per year
| Year | EPDs |
|---|---|
| 2021 | 1 |
| 2022 | 1 |
| 2023 | 12 |
| 2024 | 1 |
| 2025 | 3 |
Momentum peaked in 2023, then cooled, which often signals portfolio consolidation before the next renewal wave.
Latest activity worth noting
The most recent EPD in this set is SOCOMEC’s FUSERBLOC T4 3X1250A F/L, issued Jun 1, 2025 under Association P.E.P using the Product Category Rules for Electrical, Electronic and HVAC R Products, valid to Jun 1, 2030. That confirms active publishing and A2 alignment in this category.
Who published the EPDs, and how concentrated it is
Program operators in play:
- Association P.E.P, 16 EPDs across 3 manufacturers. This is the default venue today for electrical balance of system components in Europe, and it is used by multiple competitors, not just a single portfolio.
- EPD Italy, 1 EPD across 1 manufacturer. Useful when Italian market presence or language needs drive the decision.
- EPD Norway, 1 EPD across 1 manufacturer. A niche choice here, still visible to the European spec audience.
The headline is simple. If you need fast recognition across EU markets for floor boxes, Association P.E.P is the well worn path.
Want the latest EPD news?
Follow us on LinkedIn to get relevant updates for your industry.
Which manufacturers are leading
Manufacturers behind the current EPDs:
- ABB S.p.A, 12 EPDs
- SOCOMEC, 3 EPDs
- ABB Group, 1 EPD
- Cofrelec, 1 EPD
- Italcementi S.p.A, 1 EPD
ABB’s Italian entity has clearly systematized coverage. SOCOMEC follows with fewer but recent declarations. One entry appears adjacent to the core product scope, which sometimes happens when a related assembly is declared together. If your portfolio spans enclosures, disconnects, and floor distribution, map SKUs to declared units early to avoid messy comparabilty debates.
The PCRs that actually get used
Most teams chose category rules built for electrical and HVAC equipment. Here is the breakdown.
| PCR | EPDs | Latest expiry | Notes |
|---|---|---|---|
| Product Category Rules for Electrical, Electronic and HVAC R Products | 16 | Jun 1, 2030 | Dominant choice under Association P.E.P, widely recognized across EU buyers. |
| Product Category Rules Part A Implementation and use of EN 15804 2012 and CEN TR 16970 in Ireland | 1 | Nov 11, 2027 | Ireland focused Part A framework used once in this set. |
| Unknown PCR | 1 | Jun 29, 2028 | Single legacy entry, expect migration at renewal. |
Practical take. If direct competitors use the electrical and HVAC umbrella PCR, matching that rulebook streamlines reviews and comparability. If a niche market requires a national Part A, scope it early and confirm recognizability with target program operators.
Renewal runway, by year
A clustered expiry profile can create last minute traffic jams in verification. Here is what is scheduled to age out next.
- 2026, 1 total, all under the electrical and HVAC PCR, earliest Apr 20
- 2027, 1 total, the Ireland Part A entry, Nov 11
- 2028, 12 total, 11 under the electrical and HVAC PCR and 1 Unknown PCR, spread Jan 1 to Dec 1
- 2029, 1 total, electrical and HVAC PCR, Mar 1
- 2030, 3 total, electrical and HVAC PCR, Jun 1
Translation. 2028 is the crunch year. Begin data refresh and verifier scheduling 6 to 9 months ahead, especially if you plan scope changes or product updates during the cycle (EPD International FAQ, 2024).
Where EPD consultants show up
Three of the 18 EPDs were produced with an external EPD service provider. Many manufacturers call this an EPD consultant, and the value shows up in speed, smoother data wrangling, and completeness. If you want a white glove workflow with fast data collection across plants and SKUs, an EPD service provider like Parq can run the heavy lift while your team focuses on engineering and sales enablement.
Common naming and search angles
Spec teams and distributors also search using these terms. Floor boxes, recessed floor outlet boxes, floor service boxes, underfloor service boxes, poke thru devices, floor distribution boxes. Publishing under a recognizable program operator and using clear titles helps your product surface in those searches.
Notably absent, as of today
We checked the public registries specifiers use. Legrand does appear with floor box declarations, so they are not absent in this niche. Several other large electrical brands publish EPDs for adjacent products like cable trays, conduits, or wiring accessories yet do not appear with floor equipment box EPDs in Europe in this dataset as of Jan 22, 2026. That includes OBO Bettermann and Hager. If you compete with them on underfloor distribution, a well scoped floor box EPD is a simple way to change the comparison set at bid time.
How to act in 2026 if you plan an EPD
Pick the program operator your buyers already know, in this category that is often Association P.E.P. Match the electrical and HVAC PCR if competitors do. Lock your reference year now, confirm bill of materials coverage for the box, lid, plates, gaskets and any integrated devices, then schedule verification backwards from your target publish month. If your portfolio refresh is due in 2028, start the renewal plan now to avoid the queue.
A quick help offer and a small caveat
This article uses data from the global public registry most architects and specifiers consult. Due to loading delays, some EPDs issued in the last half of 2025 may not be reflected yet. If you want the full, up to date background dataset or a sanity check on the best fit PCR for your next floor equipment box EPD, connect with me on LinkedIn and send a message. I am happy to hop on a quick call for free to walk through options, timing, and tradeoffs.
Frequently Asked Questions
Do European buyers still accept A1 based EPDs for new floor box declarations
Major operators have closed the A1 window for new or adapted construction product EPDs. IBU states its transition period ended in Oct 2022, so new declarations use A2 there (IBU, 2025).
How long should we plan for validity and updates
Five years is typical from verification, with an in period update if any declared indicator worsens more than 10 percent (EPD International FAQ, 2024).
Which program operator is most common for floor equipment boxes in Europe
Association P.E.P holds the majority of current declarations in this niche, across multiple manufacturers, which signals easy recognizability at submittal.
