EPDs for Bulk Materials in Europe: The ultimate data guide
Planning EPDs for bulk materials in Europe in 2026 should feel clear, not cryptic. Here is the most complete, data-backed snapshot we have for construction fixings, steel fibers, anchors and related bulk items in the region, so you can decide what to publish, where, and when.


What this guide covers
Bulk materials here means high volume construction components like fasteners, anchors, steel fibers and related fixings that move by the pallet rather than by the piece. If your team calls them construction fixings or reinforcement accessories, you are in the right place.
The market, 2021 to 2025
Over the last five years we see 4 current EPDs in Europe for this category, issued by 4 manufacturers through 2 program operators using 4 distinct PCRs. The most recent EPD was issued on Oct 1 2025 for Self Drilling Screws by Hilti under EPD Hub, expiring on Oct 1 2030.
EPDs issued per year
| Year | EPDs |
|---|---|
| 2021 | 1 |
| 2022 | 0 |
| 2023 | 1 |
| 2024 | 1 |
| 2025 | 1 |
This is a small but active niche. One release each year from 2023 through 2025 signals steady attention, not a one off.
Who is publishing
Four manufacturers appear with a single EPD each. Hilti, KrampeHarex GmbH & Co. KG, Fibro Metals SRL and KORDSA. No one is flooding the field yet, which means a well timed declaration can still stand out on spec sheets.
Program operators you will meet
Two operators handle everything in this snapshot. EPD International AB accounts for 3 EPDs across 3 different manufacturers. EPD Hub accounts for 1 EPD with 1 manufacturer. That spread tells us buyers will comfortably accept either operator for bulk materials today, and that EPD International AB is the more common current home in this category. Diversity is healthy here since multiple competitors already rely on the same operator at EPD International AB, which improves comparability in bids.
PCRs in play, with expiry signals
Picking the right PCR is half the win. Here are the rulebooks used and their most relevant dates.
| PCR | EPDs using it | Latest expiry |
|---|---|---|
| Construction products, 2019:14 | 1 | Jan 18 2028 |
| EPD Hub Core PCR version 1.1, 5 Dec 2023 | 1 | Oct 1 2030 |
| PCR 2019:14 Construction products (EN 15804+A2) (1.3.3) | 1 | May 31 2029 |
| PCR 2019:14 Construction products (EN 15804:A2) (1.2.5) | 1 | Mar 31 2026 |
The newish EPD Hub Core PCR 1.1 runs furthest, which creates runway for teams that want to avoid a mid decade refresh. The older EN 15804 A2 editions still dominate, so aligning with what competitors used keeps comparisons uncomplicated for specifiers.
Want the latest EPD news?
Follow us on LinkedIn to get relevant updates for your industry.
Renewal horizon through 2030
Think of renewals like a calendar reminder you cannot snooze forever. Here is what is coming for current declarations.
- 2026: 1 EPD up for renewal on Mar 31
- 2027: none
- 2028: 1 EPD on Jan 18
- 2029: 1 EPD on May 31
- 2030: 1 EPD on Oct 1
If you are entering the market in 2026, the window is clean. Your EPD will not collide with a wave of competitor renewals, which simplifies pricing and messaging.
Consultants behind the scenes
All 4 of the current EPDs were produced with an external EPD service provider, sometimes called an EPD consultant. That lines up with what we see across construction categories where teams keep internal focus on production data accuracy and outsource the modeling and submission workflow. If you want to move fast and keep your R&D and plant teams focused, an EPD service provider like Parq is often the pragmatic choice. It is definately the easiest path when you are new to EN 15804 A2 modeling.
Product spotlight in 2025
The latest release was Self Drilling Screws from Hilti on Oct 1 2025, published at EPD Hub under EPD Hub Core PCR 1.1 with expiry on Oct 1 2030. That mix of a widely known brand and a future dated PCR version sets the bar for fasteners in 2026.
Where to publish in 2026
If your portfolio is dominated by fasteners or anchors, both EPD International AB and EPD Hub are proven choices for Europe. Teams that value long runway often pick a current PCR with a later expiry window. Teams that value comparability pick the operator and PCR that dominate competitor declarations. Either path can be right. The key is to match what your key geography and channel partners prefer, then move quickly.
Playbook for your first EPD in this niche
- Inventory one hero SKU in anchors, screws or steel fibers with stable annual volumes.
- Confirm which PCR competitors used and cross check expiry timing.
- Decide the operator based on buyer familiarity in your core markets and planned multilingual support.
- Lock a data collection window, typically one full reference year. Prospective EPDs can work for brand new lines when production has started.
- Use an EPD service partner to compress timeline and avoid costly rework.
Tables you can lift into your brief
Upcoming expiries at a glance
| Year | Count | Notes |
|---|---|---|
| 2026 | 1 | EN 15804 A2 v1.2.5 on Mar 31 |
| 2027 | 0 | |
| 2028 | 1 | 2019:14 on Jan 18 |
| 2029 | 1 | EN 15804+A2 v1.3.3 on May 31 |
| 2030 | 1 | EPD Hub Core PCR 1.1 on Oct 1 |
Who published these EPDs
| Manufacturer | Count |
|---|---|
| Hilti | 1 |
| KrampeHarex GmbH & Co. KG | 1 |
| Fibro Metals SRL | 1 |
| KORDSA | 1 |
What this means for sales and spec
For 2026, one well targeted EPD can flip outcomes in tenders that score transparency. Without a product specific EPD, buyers must apply conservative impacts, sometimes with a penalty factor, which knocks you out of consideration on projects with carbon caps. A single mid sized project win often pays back the EPD effort several times over.
Want the underlying data and a sanity check
This article is based on the global public registry of EPDs that most architects and specifiers use. Due to normal loading lags, some late 2025 declarations may not be visible yet. If you want the full up to date background dataset or a quick call to pick the best fit PCR for your next EPD, connect with me on LinkedIn and send a message. I am happy to help and share the files.
Frequently Asked Questions
Which program operator should a European fastener brand choose for a first EPD in 2026
Both EPD International AB and EPD Hub are actively used in this niche. EPD International AB currently hosts 3 of the 4 EPDs in this snapshot across 3 different manufacturers, while EPD Hub hosts 1. Choose based on buyer familiarity and the PCR you plan to use.
Is there a most common PCR for bulk material EPDs in Europe right now
No single PCR dominates. All four current EPDs use different PCRs. The longest runway belongs to EPD Hub Core PCR version 1.1 with expiries reaching Oct 1 2030.
When do current competitor EPDs expire and how does that affect timing
Expiries occur in 2026, 2028, 2029 and 2030, one per year. Launching in 2026 avoids a crowded renewal year and lets you establish a benchmark before others refresh.
Do most manufacturers rely on an external EPD consultant for this category
Yes. All 4 current EPDs were produced with an external service provider. This matches what we see across construction categories where teams keep production data in house and outsource modeling, verification and publication.
