

What is expiring and when
Global Integrated Flooring Solutions has two casegoods EPDs scheduled to expire on March 31, 2027. Both are under the BIFMA PCR for Office Furniture Workspace Products and were published with UL as program operator.
- Dufferin Freestanding Casegoods Products, valid through March 31, 2027
- Kingston Freestanding Casegoods Products, valid through March 31, 2027
Are replacements already live
As of July 20, 2026, we do not see successor EPDs for Dufferin or Kingston in the public record. That means there is an eight‑month window to renew before a gap appears. If a renewal is underway but unpublished, spec teams still need a contingency plan, since many projects require a current, third‑party verified EPD at submittal.
What this means for specs
On projects that require EPDs, missing or expired declarations typically push teams to use conservative carbon defaults or alternate products with current documentation. That creates risk of a fast substitution late in design or during procurement. No one wants a scramble on punch‑list week.
Book a free 30-min. consultation
Discuss ideas to mobilize your EPDs, review your portfolio, and generate strategies to make LCA insights impactful across your organization.
Likely alternatives with current EPDs
The options below are in the same BIFMA workspace category and have active declarations. They are not one‑to‑one matches in design, yet they often satisfy the same specification intent.
- OFS Pulse Casegood Desking Series, EPD valid to January 16, 2031
- KI Unite Panel System, EPD valid to March 27, 2031
- Innovant Private_Office, EPD valid to July 13, 2027
If Dufferin or Kingston are central to a scheme, lock a renewal date so you dont have to re‑detail casework or change finish families late in the process.
Timing that prevents a gap
Think of renewal like a relay. The baton must be in the next hand before the line.
- Set an internal “latest by” publication target at least 90 days before March 31, 2027.
- Confirm the PCR version and operator early, align on datasets, and pick the reference year for data.
- Collect site utility and materials data in one pass, including upstream supplier inputs and packaging.
- Decide which configurations belong in the new EPD so the line sheet maps cleanly to SKUs.
- Pre‑stage submittals and EC3 listing details to speed external publishing once verification clears.
Where to watch for updates
Manufacturer site: Global Integrated Flooring Solutions keeps product information at https://www.globalifs.com/.
Program operator portals are also useful to check for a newly posted PDF. UL typically lists new declarations on its public directory. A generic, third‑party search starting point is https://epd.directory.
Why timely renewal matters commercially
EPDs are not just a sustainability badge. They remove friction in bids, keep preferred products on drawings, and protect revenue when owners set carbon requirements under frameworks like LEED v5. Renewal on time means sales can pursue EPD‑required projects without side quests. The process can be light‑touch for internal teams when the data collection is orchestrated well and the verifier knows the furniture PCR landscape.
Bottom line for specifiers and manufacturers
Two Global IFS casegoods EPDs age out on March 31, 2027. No public replacements are visible yet. Either schedule the renewal now or identify alternates with current EPDs so design intent and budgets stay intact. A calm handoff beats a last‑minute bench‑swap every single time.


