

What is expiring in March 2027
EC3 currently shows three Signify N.V. EPDs slated to expire in March 2027. These cover lighting‑category products tied to specific luminaires or controlgear, following the typical EN 15804 format used for electrical products. In practice, that means cradle‑to‑gate results with options plus end‑of‑life modules are what teams lose access to the moment validity lapses.
Are replacements already visible
As of July 20, 2026, we do not see clearly labeled successor EPDs for those three documents in public listings. That said, Signify has been publishing a high volume of new EPDs across 2025 and 2026, signaling an active renewal program, and previously announced more than 2,000 EPDs covering 70,000 product variations worldwide (Signify press release, 2024). If the SKUs tied to the March 2027 set remain in the current portfolio, fresh declarations could land before the deadline.
How this impacts live specs
If an EPD lapses during bidding or submittals, design teams often pivot to alternatives with current declarations so embodied‑carbon accounting and documentation stay clean. Losing that checkbox forces project teams to use conservative defaults, which hurts competitiveness and slows approvals.
Likely alternatives with current EPDs
If a temporary gap appears, specifiers are likely to consider peer luminaires with valid declarations.
- Fagerhult Kvisten interior luminaire, EPD valid until 2028‑03‑09 (EPD International, 2023).
- Molto Luce LOG 50 SD wall or ceiling luminaire, EPD valid through 2030‑11‑15 (EPD International, 2026).
- Osmont representative surface‑mounted luminaire, EPD valid through 2031‑03‑18 (EPD International, 2026).
These are EN 15804 declarations commonly accepted on building projects and suitable stand‑ins while waiting for a like‑for‑like update.
Book a free 30-min. consultation
Discuss ideas to mobilize your EPDs, review your portfolio, and generate strategies to make LCA insights impactful across your organization.
Why renewal timing matters commercially
Most selection frameworks treat an EPD as a pass or fail item within its five‑year window. Age inside that window rarely changes outcomes, but an expired label can block a product from being counted for LEED v5 contribution or owner EPD minimums. That is when even strong pricing or performance can not overcome a paperwork gap.
Practical next steps for manufacturer teams
Audit every model on active quotes that references a Signify counterpart with a March 2027 EPD. Flag those SKUs in your CRM and share a one‑page plan with sales so no one gets blindsided. If replacements are planned, align proof‑points early, such as draft GWP tables and scope. If replacements are uncertain, have two pre‑vetted alternates ready per product family so estimators do not burn cycles searching.
Where to find Signify EPDs and product pages
Many Signify product pages host EPD PDFs directly, and the corporate sustainability hub aggregates policy and reporting resources. Start here: https://www.signify.com/global/sustainability. If a specific PDF is missing from a product page, check the brand‑family sites or ask the local Signify team for the latest link. It is a small step that often saves a day in submittals.
The bottom line for March 2027
Three Signify EPDs timing out in March 2027 is a solvable scheduling issue, not a cliff. Monitor for replacement publications, keep alternates ready, and treat the renewal clock like any other critical path deliverable. A bit of early housekeeping beats last‑minute substitutions every single time, because nobody wants to fix a spec at 10pm on a Friday, trust us. One small admin slip can ripple through weeks of coordination.
[Sources in text]
- Signify releases 2,000 EPDs covering 70,000 product variations (Signify press release, 2024): https://www.signify.com/en-us/our-company/news/press-releases/2024/20240321-signify-releases-2000-environmental-product-declarations-covering-70000-product-variations
- Fagerhult Kvisten EPD valid to 2028‑03‑09 (EPD International, 2023): https://www.fagerhult.com/globalassets/inriverresources/epd/epd_kvisten.pdf
- Molto Luce LOG 50 SD EPD valid to 2030‑11‑15 (EPD International, 2026): https://www.environdec.com/library/epd25665
- Osmont representative surface‑mounted luminaire EPD valid to 2031‑03‑18 (EPD International, 2026): https://www.environdec.com/library/epd27181


