

What is expiring in February 2027
Here are the nine Elektro Elco EPDs due to expire in February 2027. Dates reflect the validity end on the published PDFs or public registries.
- Flexline 2000, valid through 2027‑02‑20 (EPD Directory, 2026)
- Flexline 1000, valid through 2027‑02‑20 (EPD Directory, 2026)
- Flexline 500, valid through 2027‑02‑20 (EPD Directory, 2026)
- Indline G2 IP23 XL, valid through 2027‑02‑13 (EPD Directory, 2026)
- Liteline IP66+ 1500 DALI, valid through 2027‑02‑13 (EPD Directory, 2026)
- Liteline IP66+ 1500, valid through 2027‑02‑13 (EPD Directory, 2026)
- Indline Basic IP23 L 85°, valid through 2027‑02‑12 (EPD Directory, 2026)
- Indline Basic IP23 L 85° DALI, valid through 2027‑02‑12 (EPD Directory, 2026)
- Indline Basic IP23 L 85° DALI, second model listing, valid through 2027‑02‑12 (EPD Directory, 2026)
Think of this like a set of runway lights blinking out one by one. If nothing replaces them, pilots will look for the next lit runway.
Join Parq Pulse!
Stay ahead with weekly insights on product and environmental data to secure your competitive edge.
Are replacements already visible for these exact models?
As of June 20, 2026, we do not see successor EPDs posted for these exact SKUs. Elektro Elco does have several other luminaires with current EPDs into 2030 and beyond, including LED strips and pendants shown on its brand site for Hide‑a‑lite, which hosts the company’s EPD PDFs (Hide‑a‑lite EPD page). Specific examples include LED‑strip 24V Line G2 IP67 and Actor Basic Pendant with recent EPDs listed on that site (EPD Hub, 2025, via Hide‑a‑lite PDFs).
What this means for LEED v5 and public‑sector specs
If an EPD lapses during a bid, the product no longer counts as a product‑specific Type III EPD in LEED v5’s Building Product Selection and Procurement credit, where a product‑specific Type III EPD is valued at 1X for calculation purposes (USGBC, 2025, LEED v5 Additional Guidance v1.0). On projects that gatekeep with current EPDs, a gap can force a swap to a product with a live declaration. That slows sales and creates extra paperwork for teams who just want to keep submittals clean.
Likely substitutes specifiers will consider
These are not endorsements, just a snapshot of EPD‑current options in similar categories that specifiers often review when a preferred product loses its declaration.
- Sealed or robust luminaires for demanding environments: Fagerhult Multilume Hydro G3 and Multilume Hydro Robust G3 carry EPDs valid into late 2030, covering IP65 and robust variants suited to tough spaces (Fagerhult EPD Hub PDFs, 2025, example PDF).
- Industrial linear trunking or high‑efficiency lines: Glamox publishes multiple luminaires on EPD Norway that stay current into 2031, including families used for industrial and public‑building lighting (EPD Norway, 2025, example listing page for Glamox on the EPD‑Global portal).
- Track and profile systems: Zumtobel’s 3PH/L3+DALI track products appear with current EPD entries in IBU’s ecosystem and partner catalogs through 2030 (IBU via Emidat Atlas, 2025, example entry).
Always confirm technical fit. An IP66 farm‑ready luminaire is not a one‑to‑one swap for a clean‑room panel, even if both carry valid EPDs.
Renewal timing and the data reality
Renewal is easier when data collection begins early. Most programs expect a consistent reference year with real utility, material, and waste figures across the sites making the declared products. That means coordinating factories, not spreadsheets the night before. A good partner simplifies that intake so product managers and plant teams can keep building and shipping while EPD work hums quietly in the background.
Where to monitor Elektro Elco’s listings
Elektro Elco markets its luminaires under the Hide‑a‑lite brand. Their EPDs are posted here: Hide‑a‑lite EPD page. Several of the above products are also visible on the public EPD Directory under the EN 50693 PCR, which lists Elektro Elco entries with validity months, helpful for quick checks (EPD Directory, EN 50693, 2026).
What to do next
If these nine EPDs are part of active specs or framework agreements, start the renewal now. It keeps the narrative simple, the submittals tidy, and the product where it belongs in the spec. It is definately cheaper than trying to re‑win lost lanes after a lapse.


