EPD Expiry Watch

Eaton's Stainless Steel Cable Gland EPD Expires July 2027

Charlie Copa
Charlie CopaAccount Executive
November 28, 20265 min read

One of Eaton's environmental product declarations is due to expire soon: the PEP ecopassport declaration for the CAP187209 stainless steel cable gland ends on 1 July 2027. Eaton's other 35 declarations stay valid until 2029 or 2030, but no replacement for this gland has been published yet. Competitors have published few EPDs for stainless glands either. Whoever publishes current data first will have the advantage on projects that track embodied carbon, including the French RE2020 electrical lots, where products without data are assessed using conservative default values.

Logo of eaton.com

The EPD that expires next July

Eaton has 36 current EPDs in EC3. Only one of them expires in 2027: the Product Environmental Profile (PEP) for the CAP187209 Stainless Steel Cable Gland. It is valid from 1 July 2022 to 1 July 2027, which leaves about seven months from today.

The declaration was registered with PEP ecopassport under its Product Category Rules (PCR) for Electrical, Electronic and HVAC-R Products, and Eaton developed it in-house. It covers a stainless steel gland that conforms to EN 62444 and seals cable entries against water, dust and extreme temperatures. The declared reference service life is 20 years. Cable glands are small parts, but a single panel can use dozens of them.

The rest of Eaton's EPDs are recent

The gland is the odd one out. Of Eaton's 36 current EPDs, 27 run to 2029 and 8 run to 2030, and none of the company's declarations have expired. Most were published in 2024 and 2025. They cover Moeller series NZM molded case circuit breakers, switch-disconnectors, 93PR and 9PX uninterruptible power supplies (UPS), Uniled emergency lighting, Ci insulated enclosures and Judodix conduit fittings.

The gland EPD is the only one from 2022, and it is the only one built on an older edition of the PEP ecopassport PCR. Eaton's newer declarations already use the current edition. A renewal would follow the same method Eaton has used for its recent PEPs.

No replacement yet

As of today, Eaton has not published a new EPD for a stainless steel cable gland. The closest product it covers is the Capri ECP ISO20 gland, which has an EPD valid until April 2029. That gland is made of plastic, though. Polymer and stainless steel have very different footprints, so its results can't stand in for the stainless version on a project carbon calculation.

Eaton also has current EPDs for several Judodix stainless steel conduit fittings, valid until April 2029. These are conduit connectors, not cable glands, so they serve a different function on a drawing. Unless Eaton renews the stainless gland EPD, there will be no current data for it after 1 July 2027.

Join Parq Pulse!

Our weekly newsletter for manufacturers mobilizing product and environmental insights to remain competitive and win more projects.

Few competitor EPDs for stainless glands

Competitors have not filled this category. A search of EC3 turned up very few current EPDs for stainless steel cable glands from the major electrical manufacturers. One close alternative is ABB's AS12 Strain relief inlet, a cable entry for mounting boxes with a PEP ecopassport declaration valid until March 2030. It does a related job, but in lighter-duty applications.

The larger competitors could close the gap quickly. ABB has more than 1,000 current EPDs in EC3, Legrand North and Central America has over 800, and Schneider Electric has 96. A team that already publishes at that volume could add a gland EPD within a few months. In a thin category, the first current declaration can become the one specifiers reach for by default.

Why a small part still matters

PEP ecopassport is growing fast. The program passed 5,000 active PEPs in 2025 after registering 1,800 new ones in 2024, double the 2023 figure (PEP ecopassport, 2025). Several of Eaton's descriptions are written in French, and the Capri brand is well established in France. That matters because RE2020 building assessments include an electrical lot. Products without product-specific data are assessed using conservative default values, which make a building's carbon results look worse.

In practice, a specifier needs every line of a carbon calculation to hold up. An expired declaration is treated like no declaration, and the product gets the default penalty. The project team then has a reason to swap it for a product with current data, and it is the manufacturer who loses the spec. LEED v5 and other whole-building assessments use embodied carbon data the same way, so specifiers there also prefer products with current EPDs.

Seven months is enough time to renew

The gland is a relatively simple product, mostly stainless steel plus seals, so the data collection should be manageable. A renewal still needs a fresh reference year of production data, an updated LCA under the current PCR edition, independent verification and registration. Each step can slip, especially if engineering and plant teams are pulled into data requests alongside their regular work.

The less obvious risk is sales. Sales reps rarely report the bids they skip because a product lacks a valid EPD. Those losses never show up in a CRM, so the cost of a lapsed declaration usually goes unnoticed until a competitor is listed in the specifcation instead of you.

What this means for specifiers and Eaton

For specifiers, nothing changes before July 2027. The current PEP remains valid, and Eaton's other 35 declarations cover its breakers, UPS units, enclosures and fittings well into 2029 and 2030. After that date, projects that need product-specific data for stainless cable entries may have no Eaton declaration to use.

For Eaton, a renewal would bring its last 2022-era declaration onto the current PCR edition. It would also keep the company ahead in a niche that competitors have left largely empty. For other manufacturers, the lesson is simple: one expiring EPD can matter as much as dozens of new ones if it is the only data available for that product type.

Sign up for our weekly newsletter

Get the latest on ESPR, EPDs, and sustainability regulations delivered to your inbox every week.

Frequently Asked Questions

Which Eaton EPD expires in July 2027?

The PEP ecopassport declaration for the **CAP187209 Stainless Steel Cable Gland**. It is valid from 1 July 2022 to 1 July 2027. It was created under the PEP ecopassport PCR for Electrical, Electronic and HVAC-R Products and developed in-house by Eaton.

Has Eaton published a replacement EPD for its stainless steel cable gland?

Not as of November 2026. Eaton has a current EPD for its plastic **Capri ECP ISO20** gland (valid until April 2029) and for several Judodix stainless steel conduit fittings. Neither one directly replaces the data for the stainless steel gland.

Are there competitor cable gland EPDs specifiers could use instead of Eaton's CAP187209?

There are very few. EC3 shows few current EPDs for stainless steel cable glands. ABB's **AS12 Strain relief inlet** (PEP ecopassport, valid until March 2030) is an adjacent cable-entry product, but it is not a like-for-like stainless gland.

How many active EPDs does Eaton have, and when do they expire?

EC3 lists **36 current EPDs** for Eaton and none expired. **1 expires in 2027**, **27 in 2029** and **8 in 2030**. All are published through PEP ecopassport.

What PCR would a renewed Eaton cable gland EPD need to follow?

The current edition of the PEP ecopassport PCR for Electrical, Electronic and HVAC-R Products, which Eaton already uses for its 2024 and 2025 declarations. The expiring gland EPD is the only Eaton declaration still based on the older edition.

Want to win more bids?

Parq helps construction materials manufacturers get spec'd more often with industry-leading EPDs and LCAs.

Get in Touch

About the Author

Photo of Charlie Copa

Charlie Copa

Account Executive at Parq

More in EPD Expiry Watch