EPD Expiry Watch

CIAT rooftop EPDs set to expire December 2026

Four CIAT Vectios rooftop EPDs expire in December 2026, which can create last‑minute friction in bids that require a current declaration. If replacements are not published in time, specifiers will either pivot to CIAT’s newer refrigerant versions that already have EPDs or select competitors with live declarations. The smart move is to plan renewals now so sales teams are never stuck waiting on paperwork when a project clock is ticking.

Logo of ciat.com

What is expiring in December 2026

CIAT has four product EPDs expiring in December 2026, all covering the Vectios packaged rooftop family running on R410A refrigerant. These are published under the PEP ecopassport program and use a 1 kW functional unit consistent with EN 14825. They include two entries for Vectios IPJ R410A and two for Vectios Power IPJ R410A, reflecting portfolio and language variants. CIAT’s certification overview and news confirm PEP coverage across these lines (CIAT Certification page, 2026; CIAT news, 2024).

Helpful links for specifiers:

Are replacements already live

Yes for the refrigerant‑updated models. CIAT has published PEPs for the R454B versions of Vectios and Vectios Power, and promotes these as next‑gen alternatives. See CIAT’s product and news pages and the PEP registry entries for the R454B versions: Vectios Power R454B page lists the declaration, and the PEP registry records for CIAT‑10022 confirm coverage. These R454B EPDs are current as of today and carry typical program validity windows (CIAT product page, 2026; PEP registry, 2025).

Links for quick verification:

Join Parq Pulse!

Stay ahead of EPD expirations and unlock competitive insights to win more projects.

If no renewal lands in time, where specs may pivot

Specifiers typically look for a like‑for‑like rooftop or a packaged AHU with a current EPD so they can claim the credit cleanly in LEED v5 submittals. Three credible alternatives with live declarations today:

  • Systemair Geniox GO packaged units with EPD Norway listing through late 2029, a clear, public operator record that eases documentation burdens (EPD Norway, 2024).
  • Swegon GOLD and SILVER C RX sizes with current EPDs on EPD International, commonly used as outdoor packaged AHUs in similar roles to rooftops. Overview and document links are published on Swegon’s site and Environdec today (Swegon EPDs page, 2024).
  • FläktGroup eQ compact AHUs, with new EPD Hub records published in 2025 that remain current and publicly downloadable, which is exactly what submittal reviewers want to see (FläktGroup, 2025).

What this means for bids, fast

An expired EPD can stall a spec or trigger a substitution request. Teams that sell rooftops know this moment well. If the R410A Vectios models remain in play after December 2026 without fresh declarations, many specifiers will either move to CIAT’s R454B versions that already have a PEP or pick a competitor with a current, verifiable document to avoid penalties from generic data in project carbon accounting.

Scope details specifiers ask about

The expiring Vectios EPDs follow PEP ecopassport rules for electrical and HVAC‑R equipment. They declare a functional unit of 1 kW heating or cooling, reference EN 14825 usage scenarios, and cover the manufacturing modules expected for Type III declarations. That keeps comparisons credible when owners benchmark rooftop options side by side. PEP and EPD International also signed a Mutual Recognition Agreement in February 2025, which helps align practices and recognition across markets (EPD International, 2025).

Renewal timing that actually works

Treat the December 2026 deadline like a flight departure, not a meeting invite. Back‑solve from the publish date to allow for data pulls, LCA modeling, review, and operator processing. Aim for internal approval in early Q4 2026 so the team is not scrambling during year‑end shutdowns. If product changes, especially refrigerant or component shifts, are underway, lock the bill of materials early and defintely align on which PCR and operator you will use.

Useful CIAT links for your folders

For broader HVAC EPD context and how PEP is used across brands, see our related note on coverage patterns in VRF and unitary systems on EPD Guide: Mitsubishi Electric US: EPD coverage in focus.

Bottom line for specability

CIAT’s four R410A rooftop EPDs are scheduled to lapse in December 2026. R454B replacements for the same families already have PEPs, which keeps a path open inside the brand. If those do not fit the spec, packaged AHUs from Swegon, Systemair, and FläktGroup with current EPDs are likely to get the nod instead. The commercial play is simple. Renew early so sales never lose a week to paperwork while the project team is making final picks.

Sign up for our weekly newsletter

Get the latest on ESPR, EPDs, and sustainability regulations delivered to your inbox every week.

Frequently Asked Questions

Which specific CIAT EPDs expire in December 2026 and what do they cover?

Four PEP ecopassport declarations for Vectios rooftop units running on R410A: two entries for Vectios IPJ R410A and two for Vectios Power IPJ R410A. They declare 1 kW heating or cooling per EN 14825 usage scenario and cover the manufacturing and use assumptions typical for Type III EPDs. Registry pages are linked above.

Are there CIAT replacements already published for the same rooftop families?

Yes. CIAT has current PEPs for Vectios and Vectios Power on R454B, referenced on CIAT’s product pages and in the PEP registry. These keep the family spec‑eligible while the R410A declarations run out.

What competitive products with current EPDs could be specified instead?

Examples include Systemair Geniox GO with EPD Norway validity through 2029 ([EPD Norway, 2024](https://www.epd-global.com/epder/byggevarer/ventilasjon-og-ventilasjonskomponenter/geniox-go-r-hw-optimized)), Swegon GOLD/SILVER C RX sizes with current EPDs on EPD International, and FläktGroup eQ compact AHUs with 2025 EPD Hub listings ([FläktGroup, 2025](https://www.flaktgroup.com/en/news/sustainable-ventilation-flaktgroup-releases-epd-for-eq-023-032/)).

Will specifiers lose access to EPD data for these CIAT rooftops after December 2026?

For R410A variants, yes unless renewed. Many will pivot to CIAT’s R454B versions that already carry valid PEPs or to competitors with current EPDs. Planning renewals ahead of Q4 2026 prevents gaps in submittals.

Want to win more bids?

Parq helps construction materials manufacturers get spec'd more often with industry-leading EPDs and LCAs.

Get in Touch

About the Author

Photo of Eric Hansen

Eric Hansen

Vice President, Sustainability Solutions at Parq

Eric works at the intersection of sustainability, regulation, and business strategy, helping manufacturers navigate the evolving landscape of EPDs and LCAs. Having spoken with hundreds of teams across North America, brings a deep understanding of what drives ROI, what regulators are asking for, and how companies can stay ahead with smart, scalable approaches to environmental reporting.

More in EPD Expiry Watch