EPD Newcomers

Congrats, Etex Building Performance International: First EPDs Are Live

Seth Rogers
Seth RogersHead Customer Architect
November 3, 20265 min read

Etex Building Performance International published its first three Environmental Product Declarations in October 2026, all verified through EPD Hub. Together they cover nine Promat calcium silicate fire protection boards, including PROMATECT-L, PROMATECT-100 and VERMICULUX-S. Passive fire protection rarely gets swapped out once it is specified. Now the carbon numbers for these boards are available in the same directories that design teams use to model whole-building embodied carbon. Here is what was published, who it covers, and how it compares with competing fire boards.

Logo of etexgroup.com

Fire protection boards spend their working life hidden behind cladding, ceilings and steelwork, which makes them easy to forget. Embodied carbon calculations don't skip them, though. In October 2026, Etex Building Performance International published its first Environmental Product Declarations under this company profile. That puts carbon data for some of the best-known boards in passive fire protection into the same directories specifiers search every day. Congratulations to the team.

What went live in October

The debut has three EPDs, all issued by EPD Hub under the EPD Hub Core PCR (version 1.1). All three are valid until October 2031. The scope is broader than the count suggests, because two of the three are family declarations:

  • PROMATECT-LS, a single-product EPD for a calcium silicate board made with cement and mineral fillers, mainly used in interior applications
  • Mineral bound fire protective boards, one family EPD covering PROMATECT-100, PROMATECT-200, PROMATECT-250 and PROMAXON-Typ A
  • Medium density calcium silicate fire protective boards, a second family EPD covering PROMATECT-L, PROMATECT-L500, PROMATECT-AD and VERMICULUX-S

That makes nine named products in three documents. The EC3 listings don't name an outside LCA developer or consultant for these declarations. Etex's other EPDs in the database often list Etex Group itself as the developer, which suggests the LCA work may have been done in-house.

Who Etex is and why these boards matter

Etex is a Belgian building materials group. Its brands include Siniat plasterboard, Equitone facades and Promat, the passive fire protection brand behind these boards. Promat products protect structural steel, form fire-rated partitions and ceilings, and line ducts and shafts. Their buyers are mostly fire engineers, specialist installers and the architects who coordinate them. We've covered the group's wider portfolio in our Etex Group EPD coverage snapshot.

The timing works for European markets. The revised EU Construction Products Regulation has applied to most construction products since January 2026 (EU CPR 2024/3110, 2024). Denmark has also cut its limit for new buildings to an average of 7.1 kg CO2e/m²/year (BR18, 2025). When every board in a wall build-up counts toward a hard limit, a verified product-specific number is worth more than a generic default with a safety margin added on top.

Join Parq Pulse!

Our weekly newsletter for manufacturers mobilizing product and environmental insights to remain competitive and win more projects.

A clean A2 baseline for familiar products

These products aren't new to environmental reporting. Promat's own EPD library still lists an older IBU declaration for the PROMATECT-L family, dated November 2021. Sister company Etex France Building Performance holds French FDES for PROMATECT-100 and PROMATECT-L500 that run to April 2027 and use the older EN 15804+A1 rules.

The October EPDs give these product families fresh declarations valid well into the next decade. That matters because a five-year validity window closes quietly. A spec team that finds an expired PDF in a tender pack may simply move to an alternative. Renewing before that happens is a bit like changing the smoke alarm battery before it starts chirping at 3 a.m.

How the competition stacks up

We checked EC3 for the manufacturers most likely to compete with Promat for the same wall, ceiling or steelwork:

  • Skamol has a current EPD for its calcium silicate plates through EPD Danmark, valid until February 2028. Its portfolio leans toward stove and industrial insulation, but it is the closest like-for-like calcium silicate competitor.
  • ROCKWOOL Limited has an EPD for SP Firestop EN, a stone wool passive fire protection panel, valid until July 2031.
  • Knauf UK/I has an EPD for its gypsum-based Knauf Fire Panel 15 mm that expires in January 2027, only a few months away.
  • Morgan Advanced Materials covers its FireMaster fire-rated blankets with an EPD valid until September 2028.

We didn't find a current EPD for James Hardie's Aestuver fire protection boards among the James Hardie and fermacell profiles we checked. For a specifier comparing calcium silicate fire boards, that leaves a gap that Promat's broader coverage now fills.

Catching up and getting ahead at the same time

This debut puts Etex Building Performance International in two positions at once. Against Skamol and ROCKWOOL, it closes the gap. Both already had verified data, and Promat now matches them while covering more board grades than either.

Against competitors whose fire boards have no current EPD, or whose declarations expire soon, Promat has a lead. A product without an EPD often gets modelled with conservative default values, sometimes with an extra penalty percentage added. Fire protection is chosen on performance first, so the carbon data rarely wins a spec by itself. What it does is keep the board from being swapped out late when a project is chasing a carbon target, which is a sale nobody sees being lost.

Visibility is the last step

The new EPDs already appear in EC3 roughly ten days after issue, which is quick by industry standards. Promat also runs a well-organised EPD library on its website. When we checked, though, the October EPD Hub declarations didn't seem to be listed there yet, and the 2021 IBU version still represented the PROMATECT-L family.

We recommend adding the new documents, with clear validity dates, so that specifiers going directly to the brand don't download the older file. Architects who can't find a current EPD in a few clicks will often assume there isn't one.

The bigger picture

Three documents covering nine boards is an efficient way to start, and the family structure leaves room to add more products as the program expands. The data is verified, it sits in the right directories and it has five years of validity ahead of it. The remaining step is to make sure sales teams and the website are using the new files, so Promat's fire protection boards are easy to find as carbon limits tighten accross Europe.

Sign up for our weekly newsletter

Get the latest on ESPR, EPDs, and sustainability regulations delivered to your inbox every week.

Frequently Asked Questions

How many EPDs did Etex Building Performance International publish in its first release?

It published **three EPDs** in October 2026. One covers a single product (PROMATECT-LS). The other two are family EPDs that cover eight more boards: PROMATECT-100, -200, -250 and PROMAXON-Typ A in one, and PROMATECT-L, -L500, -AD and VERMICULUX-S in the other.

Which program operator verified the Etex Building Performance International EPDs for Promat boards?

All three were issued by **EPD Hub** under the EPD Hub Core PCR version 1.1. All three are valid until October 2031.

Do competing fire protection board manufacturers have EPDs comparable to Promat's new calcium silicate EPDs?

Some do. **Skamol** has a calcium silicate plate EPD valid until February 2028, and **ROCKWOOL Limited** covers SP Firestop EN until July 2031. **Knauf UK/I**'s Knauf Fire Panel EPD expires in January 2027. We found no current EPD for James Hardie's Aestuver fire boards in the profiles we checked.

Are the new Promat EPDs available on Promat's website?

Promat runs an EPD library on its website. When we checked, the new October 2026 EPD Hub declarations didn't seem to be listed yet, and an older 2021 IBU EPD still represented the PROMATECT-L family. Adding the new files would keep specifiers from downloading outdated data.

Did Promat products have EPDs before the October 2026 release?

Yes. Etex sister entities hold older declarations, including a 2021 IBU EPD for the PROMATECT-L family and French FDES for PROMATECT-100 and PROMATECT-L500 that are valid until April 2027 under EN 15804+A1. The new EPDs give these product families fresh declarations valid until 2031.

Want to win more bids?

Parq helps construction materials manufacturers get spec'd more often with industry-leading EPDs and LCAs.

Get in Touch

About the Author

Photo of Seth Rogers

Seth Rogers

Head Customer Architect at Parq

More in EPD Newcomers