

What is expiring in March 2027
Here is what is currently slated to expire in March 2027 for Swegon.
- Swegon CASA air handling units, program operator EPD International AB, category 23 74 00 Packaged Outdoor HVAC Equipment, validity through March 28, 2027.
- Swegon CASA cooker hoods, program operator EPD International AB, validity through March 28, 2027.
For Swegon’s full portfolio, start at their site and filter by product family to confirm local availability and documentation paths. See Swegon’s site for sustainability and documentation links: https://www.swegon.com
Replacement status at a glance
The CASA air handling unit EPD appears to be replaced by newer model‑level records already published. Examples on record include CASA R series units with current validity windows, plus additional CASA models listed in North America. These newer declarations should keep CASA AHUs spec‑eligible after March 2027.
We do not see a fresh EPD yet that explicitly replaces the CASA cooker hoods declaration. If that remains the case into early 2027, cooker hoods may lack a current product‑specific EPD until a new one posts.
Why the timing matters commercially
Many program operators set EPD validity at five years, which means renewal cycles are predictable and should be planned like preventative maintenance on a critical machine line (EPD International GPI, 2023). If one component in a submittal loses its EPD, some owners or GCs will ask for a different SKU or a different supplier rather than carry higher default impacts in the project carbon model under LEED v5 rules. That is time and margin you dont want to lose.
Book a free 30-min. consultation
Discuss ideas to mobilize your EPDs, review your portfolio, and generate strategies to make LCA insights impactful across your organization.
If cooker hoods are not renewed yet, what will get specified instead
There are several residential and light‑commercial AHUs with current EPDs that specifiers can match with kitchen ventilation solutions from the same brands or adjacent vendors:
- Systemair SAVE series residential AHUs, multiple current EPDs published for SAVE VTR models. These cover balanced ventilation units commonly paired with compatible kitchen extraction components.
- FläktGroup eQ 090 Air Handling Unit, current EPD window. The eQ family serves small to mid‑size projects where a documented AHU often anchors the package.
- Exhausto TOPP series AHU from Novema Aggregater AS, current EPD window for a representative configuration used in non‑residential and mixed‑use.
These are not one‑for‑one replacements for a cooker hood. They are realistic destinations for a project team determined to keep all major ventilation elements under brands with active EPD coverage while they source a hood solution.
Scope check for specifiers
Two small but useful heuristics when a component EPD is at risk.
- Confirm whether the project requires an EPD for each distinct device or will accept coverage at the system’s primary unit. This varies by owner requirements and documentation templates. If the AHU’s EPD satisfies the credit target, a short gap on a hood might be tolerable for some teams.
- Ask the program operator whether a minor variant can remain under an existing family EPD while a new, more precise declaration is under review. Program rules allow family coverage in some cases, though details differ by operator and PCR.
Renewal runway and PCRs
Publishing a timely renewal is simpler when product data collection is locked early and the chosen PCR is shared with competitors, which eases comparability and reviewer expectations. Most construction EPD programs follow ISO 14025 and EN 15804, with validity cycles and verification spelled out in the program rules rather than the standard itself, which is why operator planning is key (IBU Program Rules, 2024). The five‑year cadence gives enough room to fold in design tweaks and energy mix changes without losing spec momentum (EPD International GPI, 2023).
What this means for Q1–Q2 2027 submittals
The CASA AHUs should remain covered thanks to newer, product‑specific EPDs already in market. Without a fresh cooker hood declaration, projects that insist on an EPD for every major ventilation component may pivot to brands listing both an AHU and compatible hood path with active documentation. If Swegon publishes a replacement for the hood before March 2027, the gap likely disappears overnight.
You can also keep an eye on general EPD listings here: https://epd.directory
Bottom line for manufacturers
Keep the high‑volume SKUs continuously covered so sales does not sidestep EPD‑demanding opportunities. Build a renewal calendar, validate which products sit under family EPDs, and line up verification well before the last month of validity. Timely renewals protect specability at the exact moment your competitors would love a reason to be the easy alternative.


