

What exactly is expiring in February 2027
Three screed declarations from Saint-Gobain Portugal show a February 1, 2027 validity end date: weberfloor base, weberfloor base rapid, and weberfloor light. These are published under the International EPD System and list Portuguese production sites in Aveiro and Carregado (Saint-Gobain Portugal DAP, 2022).
Helpful links for product and EPD details:
- weberfloor base rapid page with DAP link
- weberfloor base DAP PDF: https://www.saint-gobain.pt/Documentos/declaracao-ambiental-de-produto-dap/declaracao-ambiental-produto-weberfloor-base-0.pdf
- weberfloor light DAP PDF: https://www.saint-gobain.pt/sites/mac3.saint-gobain.pt/files/assets/MAM/assets/1/2E48193A9D4C482988F498B98D0AA51D/doc/5812FCE7E0F646B287D51720D26F34FE/Declaracao_Ambiental_Produto_weberfloor_light.pdf
Replacement status today
As of June 20, 2026, we do not see newer or successor EPDs for these three SKUs. Several other Saint-Gobain Portugal mortars do remain current, for example weberfloor flow with validity to July 11, 2028, yet that is a different product and not a one‑for‑one swap for base or base rapid (Saint-Gobain Portugal DAP, 2023). Translation for sales and technical teams: if a spec calls the expiring SKUs by name and requires an in‑date EPD, there is a renewal gap forming.
Reference link for weberfloor flow DAP: https://www.saint-gobain.pt/Documentos/declaracao-ambiental-de-produto-dap/declaracao-ambiental-produto-weberfloor-flow-0.pdf
Join Parq Pulse!
Stay ahead of EPD expiries and secure your project wins with weekly insights.
Where specifiers might turn if renewals lag
When an EPD clocks out, specifiers usually move to functionally similar mortars that keep documentation current. Likely alternatives include:
- Mapei Ultraplan Eco 20, a self‑levelling compound registered with the International EPD System and valid to October 5, 2030 (EPD International, 2025)
- Sika Sikafloor‑200 Level, IBU record valid to September 25, 2027, covering cementitious modified mineral mortars (IBU, 2022)
- Kerakoll Planogel Rheo, self‑levelling gel mortar with International EPD System validity to September 17, 2029 (EPD International, 2024)
These are not endorsements, just a snapshot of live options many tender teams already know.
What this means for bids and submittals
Construction schedules behave like dominoes. One missing EPD can stall a whole submittal set or force a switch to the closest valid alternative. Teams that keep screed and underlayment declarations in‑date avoid that friction and keep price, performance, and color driving the decision rather than paperwork timing.
Timing matters more than perfection
Most buyers simply check that the EPD is product‑specific, third‑party verified, and still valid. An older but in‑date declaration usually passes the test. The risk spikes in the final six to nine months, when many procurement portals start flagging looming expiries. That is where a clean renewal, queued early, keeps momentum.
Quick steps for Saint‑Gobain Portugal category owners
- Confirm whether the three weberfloor DAPs will be renewed under EN 15804+A2 and the same PCR line, or whether a portfolio adjustment is coming instead.
- If formulation updates are planned, lock the data‑collection window now so renewal and reissue can land before February 1, 2027. That keeps specs live and avoids jobsite last‑minute swaps.
- Where a like‑for‑like renewal is not planned, guide distributors and applicators toward in‑date alternatives inside the portfolio to prevent defaulting to rival brands by habit.
One more note on program operators and portability
These screed EPDs sit with the International EPD System, which is widely recognized across Europe for EN 15804 compliance. Comparable records at IBU also see broad acceptance. The operator choice rarely decides a bid on its own, but a missing or expired record definately can.
Bottom line for spec readiness
There is still runway. Three weberfloor screed EPDs reach the end of validity on February 1, 2027, and no direct replacements appear live yet (Saint-Gobain Portugal DAP, 2022). Keep renewals on a tight cadence so projects do not drift to Mapei, Sika, or Kerakoll solely because their paperwork is current. That is how you protect spec share while the product team keeps building the next win.


