

What expires in March 2027
The following Descor Industries product‑specific EPDs are listed as valid through 2027‑03‑31. These cover workspace systems and casegoods commonly used in office and education projects.
- Licence 2
- Compile
- Foundations
- Lufton
- Corby Desking
- Philadelphia
- BOULEVARD
- FreeFit
- Versailles
- Evolve
- Boulevard System 3
- Bridges II
Replacements already published?
As of July 20, 2026, we do not see newer declarations for these same product families that extend past 2027‑03‑31. That suggests renewals are not yet live. If nothing publishes before March 2027, these products will temporarily drop out of many EPD‑required bid lists, since project teams often prefer current, product‑specific EPDs to avoid conservative default factors.
Book a free 30-min. consultation
Discuss ideas to mobilize your EPDs, review your portfolio, and generate strategies to make LCA insights impactful across your organization.
Where specs may pivot if a gap appears
If renewals slip, specifiers are likely to consider near‑match systems with current EPDs in similar categories.
- Systems and panel furniture: Haworth Compose Workspace, valid 2025‑04‑18 to 2030‑04‑18, plus Compose Echo Workspace with the same window, and Trivati Wall System valid to 2030‑04‑18. Program operator shown as NSF International.
- Panel systems: KI Unite Panel System, valid 2026‑03‑27 to 2031‑03‑27. Program operator Smart EPD.
- Casegoods and desking: OFS Pulse Casegood Desking Series, valid 2026‑01‑16 to 2031‑01‑16. Program operator EPD Hub.
- Height‑adjustable tables and meeting tables: KI Office Tables family entries like Toggle, Pillar and Pirouette, valid 2022‑11‑03 to 2027‑11‑02 under SCS Global Services.
These are not endorsements, only examples of current declarations in the same hunting ground. Dates above are pulled from publicly listed EPD records as of July 2026.
What exactly is expiring from a scope point of view
The expiring set spans classic system furniture lines, casegoods in veneer and laminate, benching, and sit‑stand tables. Most of these families typically fall under BIFMA workspace furniture PCRs and are modeled cradle‑to‑gate with options or similar office‑furniture scopes. That alignment gives spec teams apples‑to‑apples comparisons across brands during preconstruction.
Commercial impact for sales and channel partners
Losing an EPD does not change product quality. It does change the math for project teams who must document impacts. Without a current, product‑specific EPD, many owners and GCs default to generic multipliers, which makes a product look heavier on paper and easier to swap. Keeping declarations current protects margin and keeps the conversation on design, performance and lead time, not paperwork.
Timelines that avoid a last‑minute scramble
Renewal work often clusters around a five‑year cycle. That sounds long until you count backwards from a firm deadline, herd data across plants, and wait for third‑party review. A practical rhythm is to start scoping the update two quarters before expiry, lock the reference year data set early, then move to verification so publishing can land weeks before 2027‑03‑31. That cadence keeps reps out of defensive mode during bid season.
Practical checklist for the next eight months
- Confirm the full expiring SKU list and sales priorities for each family.
- Lock the reference year and sites for data pulls, including electricity, materials, scrap and packaging.
- Align on PCR version, declared unit and any product changes that need functional equivalence notes.
- Pre‑book verification capacity so you are not waiting in queue when files are ready.
Why speed and completeness matter
EPD creation is rarely blocked by modeling. It is usually blocked by missing utility bills, BOM deltas, packaging weights, or unclear plant boundaries. A white‑glove data collection push inside the organization can shave weeks. That is definitley the hidden lever that separates smooth renewals from midnight chases.
Bottom line for spec teams and product managers
Descor Industries has twelve EPDs that age out in March 2027. No replacements appear live yet, so there is a real chance of a temporary transparency gap. Competitors listed above hold current declarations across comparable systems, casegoods and tables well into 2028 to 2031. The simplest win is to start the renewal run now and publish early, so the sales path stays open when project calendars flip to spring 2027.


