EPD program picks for global data‑center power systems
Generator and UPS makers often ship the same platform into hyperscale and colo builds on both sides of the Atlantic. One EPD path rarely fits both. The trick is choosing operators that let a single LCA model travel, then mirroring into the registries buyers actually check without doing the work twice.


Why operator choice matters for power platforms
Data‑center programs want comparable, third‑party verified numbers for emissions and resource use, not marketing gloss. If the EPD sits in the wrong registry, it may never be seen during prequal. That risks being swapped for a rival that does show up in the spec tools the team already uses.
US and Europe speak different EPD “dialects”
In North America, specifiers tend to look for UL, ASTM, and Smart EPD publications for electrical and power categories. In Europe, buyers regularly search IBU and Environdec, with country databases like the Dutch NMD used for MPG calculations. NMD applies three quality classes for data acceptance, which affects if and how the EPD is counted in projects (NMD, 2025) (NMD, 2025).
One model, many outlets
A single LCA can serve both regions if it is built to EN 15804 and ISO 14025 expectations, with clear system boundaries and scenario transparency. Think of it like a universal power adapter. The plug tips change by market, the voltage stays consistent.
The ECO Platform shortcut
Publishing first with an ECO Platform–recognized operator increases reuse across European markets because mutual recognition supports cross‑listing. That avoids rebuilding the same study for every country program. We usually frame this as “publish once, mirror many”.
Where to register first
If the sales mix is balanced across the Atlantic, start with an EN 15804 operator such as IBU or Environdec to unlock broad EU use, then add a US publication with Smart EPD or UL for buyer familiarity. If revenue is US‑heavy, flip the order, but still ensure the core model meets EN 15804 so an EU release is fast later.

Win A $50 Amazon Gift Card in One Click!
Enter weekly raffle in one click • Help us get to know our readers and improve!
Mirroring without rework
Keep one master LCA model and switch out regional parameters as needed. Update electricity mixes, transport distances, and end‑of‑life scenarios to match target markets. Maintain the same product system, material bill, and cut‑off rules so results remain comparable when buyers pull both EPDs side by side.
National quirks to plan for
Netherlands projects often require NMD listing for MPG. That means mapping your EPD to the NMD format and confirming its quality class. Class selection can hinge on background data sources and verification depth, which determines whether the figure is fully creditable in Dutch tools (NMD, 2025).
Timing, renewals, and platform lifecycles
EPDs are typically valid for five years, so plan your refresh window around major component updates or emissions‑factor shifts. IBU states a five‑year validity, which is a practical planning anchor for EU‑first strategies (IBU, 2024) (IBU, 2024). Reliable cost averages are hard to pin down because each program’s scope and verification depth differ by product line.
What data‑center buyers actually check
Teams look for a familiar operator, a registry they can search quickly, and scenarios that match the build. They care that the model covers upstream manufacturing and realistic service life for backup duty cycles. They also scan for plant coverage if multiple factories feed the same platform. If those boxes are ticked, they rarely debate tiny emmissions deltas during prequal.
A compact decision path
- Map sales by region and target operator pairs that mirror easily. For EU coverage, prefer an ECO Platform–recognized operator.
- Align the PCR, then build one master LCA with region‑switchable parameters.
- Publish in the primary region first. Mirror to the secondary registry once verification wraps.
- For the Netherlands, convert to NMD format and confirm quality class before bids that require MPG.
- Schedule the renewal so it lands just ahead of a platform update, not after. There are less headaches when upgrades and declarations move in step.
The play that saves time
Publish where buyers search, reuse the same vetted core, then localize with precision. That keeps engineering focused on platform improvements while compliance stays smooth. It is not flashy, it is repeatable and it is definately faster when the data plumbing is right.
Frequently Asked Questions
Which EPD operators are commonly recognized for construction products in the European Union?
IBU and Environdec are widely used across EU markets, and many national schemes accept EPDs from ECO Platform–recognized programs.
Which operators are familiar to US specifiers for electrical and power products?
UL, ASTM, and Smart EPD tend to be the names buyers search for in North America.
Can one LCA model support both US and EU EPDs for the same generator platform?
Yes. Build the model to EN 15804 and ISO 14025, keep system boundaries consistent, and swap regional parameters like electricity mixes and end‑of‑life scenarios during mirroring.
How long are EPDs typically valid, and why does it matter for planning?
Five years is a common validity period. Plan renewal to align with platform updates so verification and product changes move together (IBU, 2024).
What is special about the Dutch NMD for data‑center projects?
NMD uses three quality classes that influence whether and how an EPD counts toward MPG. Listing in NMD can be required for projects in the Netherlands (NMD, 2025).